Pipeline Construction & Integrity

BJB has constructed more than 1,000 miles of pipeline with diameters ranging from 4 to 42 inches. We are flexible enough to meet a wide range of customer requirements, from limited scope sub-contract arrangements to full turn-key EPC or alliance agreements.

Our highly competent and experienced teams are adaptable to a variety of conditions and terrains, including difficult and remote areas. BJB utilizes considerable planning, management, and execution to ensure your project is within budget and on time.
Our installations include:

  • Oil & gas facilities
  • Water lines
  • Slurry lines
  • Pumping stations
  • Compression facilities
  • Gathering facilities
  • Trunk lines
  • Refineries
  • Cathodic protection installation
  • Close interval surveys
  • Hot spot surveys
  • Rectifier repair and maintenance
  • Commissioning / decommissioning
  • Hydrotesting
  • Painting & coating
  • Right of way selection / acquisition
  • Right of way inspection / cleanup
  • Leak surveys
  • Integrity assessment
  • Online & offline repairs
  • Line drying
  • Regulatory analysis